For QC inspectors, QA managers, and factory-floor teams

Quality control checklists with every inspection in one record.

Link a main inspection with related check forms. Capture pass/fail results, measurements, defect photos, and signatures offline, then export the completed group as one PDF.

Linked check formsOffline-firstAudit-ready PDF
9:42
QC group · Lot #QC-2287
2 of 4 · Visual & dimensional
Surface finish
Pass
Fail
Edge integrity
Pass
Fail
Length (mm)
248.3
Diameter (mm)
12.05
Overall finish
Stage 2 of 4 · Offline
One inspection, four example stages

Keep the main inspection and follow-up checks together.

Arrange the forms to match your process and reuse shared inspection details. Track which checks are complete and review the results before exporting the group.

  1. 01
    Inspection starts

    Lot intake

    Identify the lot, supplier, inspector, and inspection site. Reuse shared intake details in related check forms.

    9:42
    QC group · Lot #QC-2287
    1 of 4 · Lot intake
    Lot number
    QC-2287
    Supplier
    Acme Industrial
    GPS location
    33.1218, −96.4521Auto
    Inspector
    R. Mateo
    Stage 1 of 4 · OnlineSubmit
  2. 02
    On the bench or the floor

    Visual & dimensional

    Pass / fail every visual criterion. Photograph each defect as evidence. Dimensional measurements captured as you go.

    9:42
    QC group · Lot #QC-2287
    2 of 4 · Visual & dimensional
    Surface finish
    Pass
    Fail
    Edge integrity
    Pass
    Fail
    Length (mm)
    248.3
    Diameter (mm)
    12.05
    Overall finish
    Stage 2 of 4 · Offline
  3. 03
    When something fails

    Defect log

    Photograph the defect, record severity, and add corrective notes. Use conditional fields within a form to show follow-up questions after failed checks.

    9:42
    QC group · Lot #QC-2287
    3 of 4 · Defect log
    Example follow-up to a failed check
    Defect photos
    Defect category
    Edge chipping
    Corrective notes
    Two units show edge chipping along the 90° face. Recommend regrind of lot 12 and re-inspect.
    Stage 3 of 4 · Offline
  4. 04
    Final approval

    Inspector sign-off

    Approve or reject the lot. Inspector and supervisor sign on screen. Export the completed group or configure PDF email delivery to your chosen recipients.

    9:42
    QC group · Lot #QC-2287
    4 of 4 · Sign-off
    Final decision
    Pass
    Fail
    Inspector signature
    R. Mateo · 14:08
    Supervisor signature
    K. Park · 14:21
    Complete · bundled PDF sending
QC checklist example

A QC checklist, filled in.

This fictional example records a final inspection of 50 steel mounting brackets. Two parts failed on finish and go back for rework. Download the MobileForm PDF report to see each check result, the defect notes, a demo photo, and clearly labeled demonstration signatures.

Lot B-2291
Steel mounting brackets
Final inspection · sample of 50 · DWG SB-40 rev C
Check results for the completed QC inspection example
CheckResult
Dimensions within tolerancePass
Visual finishFail
Correct materials and componentsPass
Function or operation testN/A
Labels and markingsPass
Packaging and protectionPass
Quantity matches orderPass
Documentation completePass
DispositionRework

Defect record

Defects found
Two brackets have scratches through the powder coat on the mounting face (parts 17 and 32).
Defect photo
Scratch on bracket 17
Corrective action
Recoat parts 17 and 32 and inspect them again. Add protective film between brackets when stacking.

Fictional example. In MobileForm, defect photos attach to the record.

When to mark a check Fail

  • Dimensions within tolerance: A measured value falls outside the tolerance on the drawing.
  • Visual finish: Scratches, dents, or coating damage on a visible face.
  • Correct materials and components: A part, material, or finish differs from the specification.
  • Function or operation test: The part does not fit, move, or operate as specified.
  • Labels and markings: A label is missing, wrong, or unreadable.
  • Packaging and protection: Parts could move, rub, or get damp in transit.
  • Quantity matches order: The count differs from the order or the lot paperwork.
  • Documentation complete: A required certificate, drawing, or record is missing.
The artifact

One bundled PDF, parent + every child check.

Auditor, supplier, and your QA office all read from the same record. Every pass/fail, every measurement, every defect photo with severity, every signature — bundled into one branded PDF.

  • Linked inspection submissions
  • Defect photos tied to the failed check
  • Inspector + supervisor signatures
  • One PDF for the whole inspection
QC Inspection Report — Lot #QC-2287
Acme Industrial · Bench #4
Inspector R. Mateo · May 26, 2026 13:42 → 14:21
Form group · 4 stages
  1. 01Lot intakeR. Mateo13:42
  2. 02Visual & dimensionalR. Mateo13:58
  3. 03Defect logR. Mateo14:08
  4. 04Sign-offK. Park14:21
Checks
Surface finishPass
Edge integrityFail
Length (mm)248.3
Diameter (mm)12.05
Defect photos
Final decision
Rejected
Sign-offs
Inspector · R. Mateo
Supervisor · K. Park
MobileForm · branded PDFPage 1 / 5
Built for QC

What a real QC checklist app needs.

Build the checks your QA process needs, keep related records together, and review the completed inspection.

Linked inspection forms

Connect a main inspection to related check forms, reuse shared fields, and see which forms are complete before exporting the report.

Pass / fail + ratings

Two-tap pass/fail with emerald and red feedback. Five-star ratings for severity. Conditional follow-ups when a check fails.

Defect photos and severity

Take photo evidence right from the checklist and circle the defect with the annotation pen. Record severity in a dropdown beside it.

Offline-first on the floor

Factory floors and remote job sites both lose signal. Forms cache, captures queue, sync resumes automatically when reconnected.

Import paper QC sheets with AI

Snap your existing paper checklist or upload a PDF. AI creates a draft of fields and sections for you to review before use.

One bundled PDF per inspection

Parent inspection + every child check + every defect photo bundled into one branded PDF. No spreadsheets, no chase emails.

4+
Example inspection stages
19
Available field types
1 PDF
Bundled QC report
$0
To pilot one inspection
Old way vs MobileForm

What QC teams do today, and why audits get painful.

The old way
  1. 1
    Paper checklist on a clipboard
    Pages rip, ink smears, pass/fail boxes get ambiguous ticks that nobody can defend in an audit.
  2. 2
    Phone camera, separate from the checklist
    Defect photos live in the camera roll. No automatic link between the photo and the check it failed.
  3. 3
    Inspector follows a process by memory
    Separate sheets make it harder to see which checks are complete and which still need attention.
  4. 4
    Office re-keys the paper sheet into a spreadsheet
    Re-entering inspection data takes office time and introduces opportunities for transcription errors.
With MobileForm
  1. Linked form group
    Keep the main inspection and its check forms together, with completion status visible for each form.
  2. Photos attached to the failed check
    Every defect photo is tied to the specific pass/fail it documents. Auditor follows the trail end to end.
  3. Sign-offs inside the form
    Inspector and supervisor sign on screen, in the same record as the lot details and the submission time.
  4. One bundled PDF, no re-keying
    Parent + every child check + every defect bundled automatically. Office reads the same record auditor does.

Built for solo inspectors and full QA teams alike.

Free to pilot one inspection. Pro for unlimited form groups and branded PDFs. Team for the flat-rate dispatch.

Free
$0forever

Start with offline field forms at no cost.

  • 3 forms or form groups
  • 50 submissions/month
  • Photo, GPS, and signature fields
  • PDF export
  • Fill forms offline with no signal
Get started free
Most popular
Pro
$228if paid monthly
$190/user/yr

For individuals and small teams that need unlimited forms.

  • Unlimited forms
  • Unlimited submissions
  • Barcode & QR scanning
  • Client share links
  • Custom PDF branding
  • Conditional fields / skip logic
  • Calculation fields
  • Inventory catalog for line items
  • Repeating sections for multi-instance data
  • Google Sheets live sync
Get started
TeamBest for teams of 3+
$504if paid monthly
$420/yr

Flat rate for your field-ops team. Unlimited field workers, no per-field-tech billing.

  • Everything in Pro
  • Pre-fill and dispatch forms to specific field techs
  • Owner and admins can dispatch; field techs are free
  • Unlimited field workers included
  • Team admin dashboard
  • Dedicated support
Get started

Why field techs are included on Team

Pro is billed per user for builders and admins. Team includes unlimited field workers who receive assignments, so you can dispatch work to your crew with a flat subscription price.

Wilson McLain Plumbing logo
“MobileForm has been a game-changer for our field-to-office communication! Its user-friendly design makes creating forms incredibly easy, even for someone who has never used the platform before. By streamlining communication, automating processes, and eliminating unnecessary steps, MobileForm helps us work smarter and more efficiently. Best of all, it creates seamless accountability, ensuring everyone stays informed, aligned, and responsible from the field to the office.”
Tim Fogle, Director of Business Affairs, Wilson McLain Plumbing

QC checklist questions, straight answers.

How is a form group different from a normal QC checklist?

A form group links a main inspection with related check forms. Shared fields can carry information from the main form into the checks, and the group shows which forms are complete. Export the completed group as one PDF.

Can I show follow-up fields when a check fails?

Yes. On Pro, use conditional fields within a form to show defect notes or photo fields after a failed check. Form groups organize related forms; field conditions do not automatically skip or unlock entire stages.

Does it work offline on a factory floor with no signal?

Open the forms you need while online before starting an inspection. Cached forms can capture answers, defect photos, and signatures offline. Submissions stay on the device and sync when it reconnects.

Can I record different inspectors and sign-offs?

Add inspector names and signature fields to the relevant check forms. Team supports dispatching forms to field workers. Form groups organize the records; they do not create separate role-based access rules for each stage.

Can I bring an existing paper QC form into MobileForm?

Yes. Upload a photo or PDF of your checklist. AI creates a draft of its fields and sections for you to review and adjust before use. Page limits and monthly import allowances depend on your plan.

How does pricing work for a 5-inspector QA team?

Free includes 3 forms or form groups and 50 submissions/month. Pro costs $19 per user per month, or $190 per user billed annually. Team costs $42 per month, or $420 billed annually, and includes the owner, invited admins, and unlimited field workers receiving assignments. Pro and Team include unlimited forms and submissions.

Pilot a full inspection free

Trade paper clipboards for one auditor-ready PDF.

Build a 4-stage QC form group in under ten minutes. Run one inspection through it. Send the bundled PDF to the supplier and your QA office from the same screen.